After the concrete has set the formwork was removed next stage is the application of Bitium tanking. painted on with a roller then the two sheets are torched on sealed.
I am a lecturer of Interior Architecture In the Institute of Technology Sligo in the Areas of Building Science & Technology and Graphic Communication CAD
No comments:
Post a Comment