Final sections of floor slab being poured and vibrated in order to remove air pockets and and to make sure concrete is correctly/evenly dispersed. This is done in order to achieve the type of finish as specified by the Architect/Engineer
I am a lecturer of Interior Architecture In the Institute of Technology Sligo in the Areas of Building Science & Technology and Graphic Communication CAD
No comments:
Post a Comment